| Manufacturing Processes | CNC milling, CNC turning, Precision Grinding, EDM Machining, 3D printing, Injection molding, Casting, Forging, Aluminum Extrusion, Sheet Metal Fabrication, Surface Finish, etc. |
|---|---|
| Materials | Aluminu AL6061, AL6063, AL7075, AL5052, ADC12, A356, etc. Stainless Steel S.S.303, S.S.304, S.S.316, S.S.316L, etc. Steel Tool Steel, Mild steel, Carbon steel, 4140, 4340, Q235, Q345B, 20#, 45#, S136, SKD11, etc. Iron SPCC, SGCC, SECC, SPTE, 1213, 12L14, 1215, etc. Brass C36000 (C26800), C37700 (HPb60), C38500 (HPb58), C27200 (CuZn37), C28000 (CuZn40), etc. Bronze C51000, C52100, C54400, etc. Plastic ABS, PC, Nylon, PEEK, POM, Acrylic, etc. |
| Surface Finish | Anodizing, chemical film, oxide, zinc-plated, nickel-plated, chrome-plated, silver-plated, gold-plated, Teflon coating, powder coating, PVD coating, heat treatment, passivation, sandblasting, brushing, polishing, etc. |
| Tolerance | 1. CNC Turning tolerance: +/-0.01mm 2. CNC Milling Tolerance: +/-0.01mm 3. WEDM tolerance: +/-0.01mm 4. EDM Mirror tolerance: +/-0.005mm 5. Precision Grinding: +/-0.005mm |
| Drawing Format | PDF / DWG / IGS / STEP / STP / X_T |
| Packing | Wood case or carton. 1, With plastic bag and pearl-bubble bag. 2, To be packed in cartons or wood cases. 3, Use adhesive tape to seal cartons or nail screws to tighten the wood case. Different packing methods will be chosen according to different projects to ensure safe shipping. |
| Shipping | 1) 0-100kg: by express or by air as priority. It takes 3 to 5 days by express, like DHL, UPS, and FedEx. And 7 to 15 days by air. 2) >100kg: by sea as a priority. It takes 25 to 40 days. |
| MOQ | 1 PCS |
| Trade Terms | EXW, FOB, CIF, As per customer's request |
| Payment Terms | PayPal or T/T |
| Lead Time | 3 to 5 days for top urgent prototypes, and it finally depends on order quantity and complexity. For general projects, lead time is 10 to 20 days. |